| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
11083 |
6/17/2026 |
John Northway |
Rick’s bedroom wall needs to be painted behind the television |
6/22/2026 |
|
|
| |
11124 |
6/17/2026 |
Thomas Alexander |
Chairlift installation scheduled today for Alex, upstairs room. |
|
|
|
| |
10822 |
5/14/2026 |
Thomas Alexander |
Rick's bathroom toilet needs to be caulked at the bottom. Behind the kitchen sink needs to be painted The wall beside the kitchen window needs to be spackled and painted. |
|
|
|
| |
10804 |
5/6/2026 |
John Northway |
The wall behind the kitchen sink needs to be repaired |
5/11/2026 |
|
|
| |
10805 |
5/6/2026 |
John Northway |
Rick needs a stand under his bedroom TV |
5/11/2026 |
|
|
| |
10806 |
5/6/2026 |
John Northway |
Bathroom toilet upstairs needs to be caulked at the bottom |
5/11/2026 |
|
|
| |
10807 |
5/6/2026 |
John Northway |
Bathroom toilet upstairs needs to be caulked at the bottom |
5/11/2026 |
|
|
|