7068 |
8/24/2022 |
Shibu John |
The ceiling in the basement above the fridge needs to be painted |
8/26/2022 |
|
|
| |
7069 |
8/24/2022 |
Shibu John |
Basement bathroom Near the toilet paper holder needs to be painted |
8/26/2022 |
|
|
| |
7070 |
8/24/2022 |
Shibu John |
Needs to clean the dryer lint from outside by the back door |
8/26/2022 |
|
|
| |
7071 |
8/24/2022 |
Shibu John |
The laundry room wall still has mold on the walls |
8/26/2022 |
|
|
| |
6559 |
3/9/2022 |
Shibu John |
Sitting room wood floor and TK's floor needs to be changed because it is coming out and obstructing the wheel chair. |
3/18/2022 |
|
|
| |
6560 |
3/9/2022 |
Shibu John |
Steps downwards to the basement side wood in out |
3/11/2022 |
|
|
| |
6561 |
3/9/2022 |
Shibu John |
The bulb at the back yard and the basement need replacement. |
3/11/2022 |
|
|
|