| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
8514 |
9/18/2024 |
Olivia Edwards |
Kitchen and living room need 4 lightbulbs to be replaced on the recess lights. 2 are completely out and the other two are very dim/almost out |
|
|
|
| |
8515 |
9/18/2024 |
Olivia Edwards |
Kitchen ceiling vent above the stove is rusted. |
|
|
|
| |
8516 |
9/18/2024 |
Olivia Edwards |
Kitchen ceiling vent above the stove is rusted. |
|
|
|
| |
8517 |
9/18/2024 |
Olivia Edwards |
2 light bulbs needed in the main bathroom. |
|
|
|
| |
8518 |
9/18/2024 |
Olivia Edwards |
William is missing knob on his dresser. - replace missing knob |
|
|
|
| |
8519 |
9/18/2024 |
Olivia Edwards |
Back deck needs to be power washed. |
|
|
|
| |
8520 |
9/18/2024 |
Olivia Edwards |
Ceiling in the kitchen above the stove has food stains - repainting of the ceiling |
|
|
|
|