| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
3529 |
11/21/2019 |
Shibu John |
Jason's Room - Wall above his door on the outside needs to be painted |
11/25/2019 |
|
|
| |
3530 |
11/21/2019 |
Shibu John |
Main door: The door has holes in it probably from previous lock. Needs to be filled in |
11/22/2019 |
|
|
| |
3531 |
11/21/2019 |
Shibu John |
Door to Garage : -The door frame is cracked |
11/21/2019 |
11/22/2019 |
|
| |
3532 |
11/21/2019 |
Shibu John |
Kitchen and Living Room : - Ceiling needs to have the paint blended |
11/21/2019 |
|
|
| |
3533 |
11/21/2019 |
Shibu John |
RS Room:- Tub needs to be re-glazed |
11/21/2019 |
|
|
| |
3534 |
11/21/2019 |
Shibu John |
Main Bathroom :- Tub needs to be re-glazed |
11/21/2019 |
|
|
| |
3526 |
11/15/2019 |
Shibu John |
Kitchen Sink leakage |
11/15/2019 |
|
|
|