| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
10620 |
2/20/2026 |
Renee Rawlings |
The bottom of the ramp is missing a hunk of cement |
|
|
|
| |
10621 |
2/20/2026 |
Renee Rawlings |
The wood panel at the bottom of the basement steps needs to be repaired |
|
|
|
| |
10622 |
2/20/2026 |
Renee Rawlings |
Back bedroom one left window screen needs to be pushed back into place
|
|
|
|
| |
10558 |
2/19/2026 |
Stacey Edwards |
Matt needs a new full size mattress and a mattress protector. |
|
|
|
| |
10559 |
2/19/2026 |
Stacey Edwards |
the flooring outside of the shower room and ReShawn's bedroom is splitting. like the boards are not connecting at the seams. |
|
|
|
| |
10546 |
2/17/2026 |
Renee Rawlings |
Bedroom on the left nightstands need to be switched to match the dressers |
|
|
|
| |
10547 |
2/17/2026 |
Renee Rawlings |
The top of the Coffee table / legs lacquer is peeling |
|
|
|
|