| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
3276 |
8/21/2019 |
Stacey Edwards |
the columns on the front porch are chipping paint and rusty at the bottom and need to be rapinted. the handrails on the wheelchair ramp are in need of repainting. |
|
|
|
| |
3277 |
8/21/2019 |
Stacey Edwards |
SW's front bedroom window stillneeds to be covered in film, and the wall below said window needs to be repaired and painted. |
|
|
|
| |
3257 |
8/14/2019 |
Stacey Edwards |
the doorbell on the inside needs to be replaced, the cover is missing and per Jai the cover cannot be replaced. |
|
|
|
| |
3249 |
8/12/2019 |
Stacey Edwards |
issues from QA report 8/11/2019
1-a few boards on the deck need to be painted or stained
2-living room wall by bay window needs to be painted, has some deep scratches on it.
3- popcorn ceiling in the small hallway bathroom needs to be repainted.
4-master bathroom floor tile has some cracked tiles. as well as the wall behind he trash can in there needs to be touched up and painted.
5-main wheelchair ramp by front door needs to be painted.
6-gutter guard needs to be rehung (already in steds)
7-anthony's room window is missing a crank
8-dining room wall by the tv needs to be repainted.
9- hallway panels need to be resecured to the wall (already in steds) |
|
|
|
| |
3238 |
8/8/2019 |
Stacey Edwards |
the board paneling to the left of the main bathroom door is warped and needs to be renailed down or replaced.
2-the wall behind the trashcan in Jm's bathroom needs to be painted.
3- a piece of siding came off the front of the house. |
|
|
|
| |
3239 |
8/8/2019 |
Stacey Edwards |
from qa report
1- few boards on the deck need to be painted.
2-small main bathroom, the popcorn ceiling needs to be painted.
3- JM and AU bathroom floor tiles cracked. |
|
|
|
| |
3200 |
7/26/2019 |
Stacey Edwards |
The recliner Aubrey sits in is broken. It tips to the right really badly as well as flips back too far. the cushion is also worn. |
|
|
|
|