Search

Maint Request
Location  Log# Issue Date Requested By Issue Target Date Completed On Notes/Resolution
  3257 8/14/2019 Stacey Edwards the doorbell on the inside needs to be replaced, the cover is missing and per Jai the cover cannot be replaced.
  3249 8/12/2019 Stacey Edwards issues from QA report 8/11/2019

1-a few boards on the deck need to be painted or stained

2-living room wall by bay window needs to be painted, has some deep scratches on it.

3- popcorn ceiling in the small hallway bathroom needs to be repainted.

4-master bathroom floor tile has some cracked tiles. as well as the wall behind he trash can in there needs to be touched up and painted.

5-main wheelchair ramp by front door needs to be painted.

6-gutter guard needs to be rehung (already in steds)

7-anthony's room window is missing a crank

8-dining room wall by the tv needs to be repainted.

9- hallway panels need to be resecured to the wall (already in steds)
  3238 8/8/2019 Stacey Edwards the board paneling to the left of the main bathroom door is warped and needs to be renailed down or replaced.

2-the wall behind the trashcan in Jm's bathroom needs to be painted.

3- a piece of siding came off the front of the house.
  3239 8/8/2019 Stacey Edwards from qa report

1- few boards on the deck need to be painted.

2-small main bathroom, the popcorn ceiling needs to be painted.

3- JM and AU bathroom floor tiles cracked.
  3200 7/26/2019 Stacey Edwards The recliner Aubrey sits in is broken. It tips to the right really badly as well as flips back too far. the cushion is also worn.
  3194 7/22/2019 Stacey Edwards dryer is not working.
  3097 6/4/2019 Stacey Edwards the master bathroom shower is not flowing properly, not a lot of water flow during shower.