| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
7895 |
6/13/2023 |
Olivia Edwards |
sitting room ceiling lights were change - ceiling around lights needs to be repainted |
|
|
|
| |
7896 |
6/13/2023 |
Olivia Edwards |
basement steps need to be repainted |
|
|
|
| |
7897 |
6/13/2023 |
Olivia Edwards |
basement floor needs to be painted |
|
|
|
| |
7786 |
5/9/2023 |
Olivia Edwards |
kitchen has a dead outlet on the left wall by where the microwave was (microwave was moved to new location to be used) |
|
|
|
| |
7776 |
5/3/2023 |
Olivia Edwards |
Basement steps need to be re-enforced and the 4th step going down the board needs to be replaced (it feels as if its going to snap when weight is placed on it) |
|
|
|
| |
7757 |
4/19/2023 |
Olivia Edwards |
Devan's door needs to be reinstalled and a door cover installed on the bottom part to prevent the extreme scraping |
|
|
|
| |
7758 |
4/19/2023 |
Olivia Edwards |
d's (test) |
|
|
|
|