| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
1097 |
5/4/2017 |
Yuleisi Dasilva |
BK screen on bathroom window is missing |
|
|
|
| |
1076 |
5/3/2017 |
Yuleisi Dasilva |
window screen on BK and BW window both need to be repaired |
|
|
|
| |
1078 |
5/3/2017 |
Yuleisi Dasilva |
soundbar for bryan K. needs to be put up on wall it is still sitting in the basement |
|
|
|
| |
1067 |
4/28/2017 |
Yuleisi Dasilva |
faucet in kitchen is leaking, needs to be changed |
|
|
|
| |
1060 |
4/24/2017 |
Yuleisi Dasilva |
Hallway closet shelves need to be replaced. currently they have only strips on board not actual shelves in the closet. The closet should also be repainted |
|
|
|
| |
1022 |
4/10/2017 |
Yuleisi Dasilva |
Bryan Kelly's room needs to be repainted. |
|
|
|
| |
994 |
4/4/2017 |
Yuleisi Dasilva |
tile in the kitchen is cracked needs to be fixed. wall in laundry room still has cracks needs to be fixed. ramp outside still has not been painted. |
|
|
|
|