| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
8089 |
11/8/2023 |
Thomas Alexander |
Paint entire walls and basement walls, steps to the basement, except newly constructed room. |
11/8/2023 |
|
|
| |
8005 |
8/18/2023 |
Thomas Alexander |
New room and toilet construction for (CS) at the rear of the house. Driveway expansion, Wheelchair ramp reconstruction. Air condition/heating system upgrade |
8/31/2023 |
|
Under construction/inspection |
| |
7985 |
8/4/2023 |
Shibu John |
Basement steps need to be painted |
8/7/2023 |
|
|
| |
7839 |
5/31/2023 |
Shibu John |
Exterior wood around the windows needs to be painted |
6/9/2023 |
|
|
| |
7840 |
5/31/2023 |
Shibu John |
Thin black pipe is damaged at back of home |
6/9/2023 |
|
|
| |
7841 |
5/31/2023 |
Shibu John |
2 Big boxes of furniture in the basement, under the stairs, house manager is not sure what and who its for also reported the same many times. |
6/9/2023 |
|
|
| |
7650 |
4/11/2023 |
Shibu John |
Long crack on the front cement walkway.
|
4/14/2023 |
|
|
|