| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
10322 |
12/3/2025 |
Elizabeth Otieno |
The basement bathroom cabinet is missing a knob |
|
|
|
| |
10323 |
12/3/2025 |
Elizabeth Otieno |
The wall under the time clock needs to be repaired |
|
|
|
| |
10236 |
10/30/2025 |
Elizabeth Otieno |
The bsemenet bathroom cabinet is missing a knob |
|
|
|
| |
10237 |
10/30/2025 |
Elizabeth Otieno |
The ceiling light in the basement needs repair |
|
|
|
| |
10238 |
10/30/2025 |
Elizabeth Otieno |
The cabinet over the microwave is missing handle |
|
|
|
| |
10194 |
10/8/2025 |
Elizabeth Otieno |
The front door at the top is ripping apart and the door needs painting as well |
|
|
|
| |
10007 |
8/29/2025 |
Harvinder Kour |
house needs paint from many sides. |
|
|
|
|