| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
2758 |
2/4/2019 |
Stacey Edwards |
bathroom on first floor has a crack on the soap dish. also the bathtub needs to be caulked. |
|
|
|
| |
2759 |
2/4/2019 |
Stacey Edwards |
the wall outside the door frame of the first bedroom door, first floor, on the left, has a huge crack that needs to be repaired. |
|
|
|
| |
2760 |
2/4/2019 |
Stacey Edwards |
bedroom, first floor, first on the left, still does not have a tv in there. |
|
|
|
| |
2761 |
2/4/2019 |
Stacey Edwards |
downstairas bedroom, the bed needs to be fixed, the headboard is broken and not attached. |
|
|
|
| |
2762 |
2/4/2019 |
Stacey Edwards |
the handrail leading to the basement is loose and needs to be tightened. |
|
|
|
| |
2755 |
1/30/2019 |
Brittany Harris |
there's a hole in the wall in the kitchen in front of the fridge |
|
|
|
| |
2717 |
1/11/2019 |
Brittany Harris |
they still need dinning room chairs they only have 3 |
|
|
|
|