| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
2185 |
5/17/2018 |
Roderick Wallace |
the kitchen sink is leaking |
|
|
|
| |
2107 |
4/19/2018 |
Brittany Harris |
the curtain rod on the sliding door upstairs has been broken by alex from Lucerne |
|
|
|
| |
2061 |
4/5/2018 |
Brittany Harris |
the front door needs to be painted over a and the hinge on the front door also need to still be fixed at the top |
|
|
|
| |
2062 |
4/5/2018 |
Brittany Harris |
some of the chairs still need to be tighten up at the dinning table |
|
|
|
| |
2063 |
4/5/2018 |
Brittany Harris |
the third bulletin board still needs to be put up right next to the other two. if you mover over the picture some you can put the third board up right next to the other two |
|
|
|
| |
2064 |
4/5/2018 |
Brittany Harris |
there is a hole behind Kenny door that need to be fixed. |
|
|
|
| |
2054 |
4/4/2018 |
Brittany Harris |
front door needs to be painted still and the hinge still need to be fixed at the top of the front door |
|
|
|
|