| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
8276 |
4/2/2024 |
Shibu John |
Remove the 2 bricks from the front side of the house (as referred in QA report dated 04/02/24) |
4/5/2024 |
|
|
| |
8277 |
4/2/2024 |
Shibu John |
Remove the office chair from the dining area. In a horrible shape with lots of wear and tear |
4/5/2024 |
|
|
| |
8082 |
10/26/2023 |
Thomas Alexander |
Generac generator installation, advance paid 7/2023. Design and proposal approved for electric and gas meter upgrades to BGE 5/2023. Generator installed and waiting for BGE to complete job. |
12/29/2023 |
|
|
| |
7981 |
8/4/2023 |
Shibu John |
Damages around the doorway to GM’s room |
8/11/2023 |
|
|
| |
7982 |
8/4/2023 |
Shibu John |
Paint chipping off on the second floor bathroom doorway |
8/7/2023 |
|
|
| |
7983 |
8/4/2023 |
Shibu John |
Vines growing from under the deck through top of the deck |
|
|
|
| |
7984 |
8/4/2023 |
Shibu John |
Vines growing from under the deck through top of the deck |
8/7/2023 |
|
|
|