Search

Maint Request
Location  Log# Issue Date Requested By Issue Target Date Completed On Notes/Resolution
  200 5/27/2016 Rasheedah Ogunbiyi The wooden floors in the whole house needs to be stripped, sand and repainted with glossy paint. The floors looks bad even after cleaning and polishing .
The basement light bulb need to be replaced(4 bulbs)
S.s closet door needs to be fixed.
the light in the refrigerator needs to be replaced.
  201 5/27/2016 Rasheedah Ogunbiyi The wooden floors in the whole house needs to be stripped, sand and repainted with glossy paint. The floors looks bad even after cleaning and polishing .
The basement light bulb need to be replaced(4 bulbs)
S.s closet door needs to be fixed.
the light in the refrigerator needs to be replaced.
  183 5/20/2016 Rasheedah Ogunbiyi
  184 5/20/2016 Rasheedah Ogunbiyi The alarm at the entrance door is not working.
the light bulb in the refrigerator needs to be replace.
the closet door in s.s room needs to be fix.
  172 5/13/2016 Rasheedah Ogunbiyi The closet door in S.s room needs to be fix.
The light bulb in the refrigerator needs to be replace.
  154 5/6/2016 Rasheedah Ogunbiyi The alarm at the entrance door is not working.
D.B needs a new light bulb in her room.
  95 3/29/2016 Aruna Fofana The wooden floors in the whole house needs to be stripped, sand and repainted with glossy paint. The floors looks bad even after cleaning and polishing 3/29/2016