| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
10982 |
6/5/2026 |
Jari Watson |
Bathroom door frame needs to be painted |
6/12/2026 |
|
|
| |
10983 |
6/5/2026 |
Jari Watson |
New toilet paper holder for the basement |
6/12/2026 |
|
|
| |
10984 |
6/5/2026 |
Jari Watson |
Behind the bathroom toilet in the basement- the baseboards need to be painted |
6/12/2026 |
|
|
| |
10985 |
6/5/2026 |
Jari Watson |
The front door steps need to be repaired |
6/12/2026 |
|
|
| |
10952 |
6/1/2026 |
Jari Watson |
• Mailbox – The Mailbox numbers are faded and need repainting. |
6/8/2026 |
|
|
| |
10820 |
5/14/2026 |
Thomas Alexander |
The baseboards behind the bathroom need to be painted Water hose holder needed |
|
|
|
| |
10769 |
4/28/2026 |
Thomas Alexander |
Side porch needs to be painted. Baseboards in the didning room need a little paint. The baseboards behind the bothroom toilet need to be painted in the basement. |
|
|
|
|