Search

Maint Request
Location  Log# Issue Date Requested By Issue Target Date Completed On Notes/Resolution
  3511 11/7/2019 Stacey Edwards The door frame around the basement bathroom needs to be repaired. it is damaged on the bottom and will also need to be repainted.
  3512 11/7/2019 Stacey Edwards the wipe erase board in the basement needs to be replaced. it has a few dings and looks very bad.
  3513 11/7/2019 Stacey Edwards the wall (where the wipe erase board is located), has been damaged due to the end table being pushed into it.
  3495 11/1/2019 Stacey Edwards Daisha's entire bedroom needs to be painted, also behind the bed is damaged from the headboard.
  3496 11/1/2019 Stacey Edwards Daisha was so excited this morning that as she was bouncing on her bed the board under the bed at the foot broke, so mattress and box spring are lopsided. needs to be repaired.
  3497 11/1/2019 Stacey Edwards Daisha's dresser needs to be replaced. I would encourage new furniture for the entire bedroom.
  3453 10/22/2019 Stacey Edwards the handle on the new door at the top of the basement stairs needs to be changed to a new non lock door. just a plain door knob is needed.