| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
3511 |
11/7/2019 |
Stacey Edwards |
The door frame around the basement bathroom needs to be repaired. it is damaged on the bottom and will also need to be repainted. |
|
|
|
| |
3512 |
11/7/2019 |
Stacey Edwards |
the wipe erase board in the basement needs to be replaced. it has a few dings and looks very bad. |
|
|
|
| |
3513 |
11/7/2019 |
Stacey Edwards |
the wall (where the wipe erase board is located), has been damaged due to the end table being pushed into it. |
|
|
|
| |
3495 |
11/1/2019 |
Stacey Edwards |
Daisha's entire bedroom needs to be painted, also behind the bed is damaged from the headboard. |
|
|
|
| |
3496 |
11/1/2019 |
Stacey Edwards |
Daisha was so excited this morning that as she was bouncing on her bed the board under the bed at the foot broke, so mattress and box spring are lopsided. needs to be repaired. |
|
|
|
| |
3497 |
11/1/2019 |
Stacey Edwards |
Daisha's dresser needs to be replaced. I would encourage new furniture for the entire bedroom. |
|
|
|
| |
3453 |
10/22/2019 |
Stacey Edwards |
the handle on the new door at the top of the basement stairs needs to be changed to a new non lock door. just a plain door knob is needed. |
|
|
|
|