| Location |
Log# |
Issue Date |
Requested By |
Issue |
Target Date |
Completed On |
Notes/Resolution |
| |
7181 |
10/24/2022 |
Shibu John |
The deck needs to be painted |
10/28/2022 |
|
|
| |
7182 |
10/24/2022 |
Shibu John |
Crack on the ceiling between kitchen and living room that have been fixed, needs to be painted |
10/28/2022 |
|
|
| |
7183 |
10/24/2022 |
Shibu John |
Some of the drop ceilings in the basement has water marks |
10/28/2022 |
|
|
| |
7184 |
10/24/2022 |
Shibu John |
The laundry room floor has water stained from previous water leaking |
10/28/2022 |
|
|
| |
7185 |
10/24/2022 |
Shibu John |
The kitchen refrigerator handle is loose |
10/28/2022 |
|
|
| |
7186 |
10/24/2022 |
Shibu John |
The hallway bathtub is very old and has stains that does not go away with cleaning |
10/28/2022 |
|
|
| |
7052 |
8/24/2022 |
Shibu John |
The deck needs to be power washed and painted |
8/26/2022 |
|
|
|