2765 |
2/5/2019 |
Adeola Akinremi |
In the main bathroom, the Bottom of the toilet floor has the vinyl sheet coming off. Still not done. This has been on QA report and STEDS since 6/18, Now even worse. Also, top drawer on the vanity is broken. Equally, one additional board is required with Plexiglas. Also, 4 ceiling panels are down in the basement. kindly fix. For the kitchen, the wall by the table and window is scratched. 3 new kitchen table chairs are needed. The current ones are filthy because they were made of suede. Get wood ones or leather ones to replace them. The other need will be several air freshner dispenser to keep away the stench.of urine |
|
|
|
| |
2763 |
2/4/2019 |
Adeola Akinremi |
Water closet in Kelly's room is broken from underneath and cannot retain water for his toilet use. Kindly fix as a matter of priority. Thanks. |
|
|
|
| |
2722 |
1/16/2019 |
Tiffany Smith |
front steps of unit are cracked |
|
|
|
| |
2681 |
12/26/2018 |
Tiffany Smith |
curtain rod in dining room needs to nailed back up |
|
|
|
| |
2650 |
11/27/2018 |
Tiffany Smith |
Bryan Kelly cracked the tv protector. glass needs to be replaced |
|
|
|
| |
2621 |
11/5/2018 |
Yuleisi Dasilva |
B. Woods old mattress needs to be picked up. still in backyard per instructions from maintenance |
|
|
|
| |
2598 |
10/19/2018 |
Yuleisi Dasilva |
wood panels on wall in B Woods room need to be repaired |
|
|
|
|